Position: Homepage > Focus > Subsidairy News
MCC SKET Signs Contract for Shenyang Neusoft Water Source Heat Pump Project
CopyFrom:MCC Date:17 July 2017
+ . -

  On July 15th, MCC SKET signed a contract for the investigation, shaft sinking and demonstration works of Shenyang Neusoft’s Buildings A1, A3 and A4 Water Source Heat Pump Project.

  This project is located at 2 Xinxiu Street in Hunnan District, Shenyang City. Building A6 and the administration building use a water source heat pump system for supply heating in the winter and cooling in summer. It is currently in a good operating condition. MCC SKET completed the shaft sinking and demonstration works of the Building A6 Water Source Heat Pump Project in 2013. The Buildings A1, A3 and A4 Water Source Heat Pump Project is a reconstruction project. Two test wells and 6 hydrogeological observation wells are set to be constructed. The inspection and demonstration works are mainly intended to identify the hydrogeology of the site on which the water source heat pump well is planned to be built, analyze the mutual interference and influence between the reconstructed water source heat pump and the water source heat pump of Building A6 and the administration building, and provide relevant suggestions.


MCC

轻推
XML 地图 | Sitemap 地图

中科汇联承办,easysite内容管理系统,portal门户,舆情监测,搜索引擎,政府门户,信息公开,电子政务